New steel for SL

The CN Rail track through Slave Lake is getting some new rails. Those are the very long ones lying alongside the existing track. Kate Fenske of CN says it’s a two-mile stretch through town getting the new rails. Three crossings are also being re-habbed. Earlier, 15 miles of rail was replaced between Canyon Creek and Kinuso.

 

Share this post