Lots going on

Work on the 5th Ave. NW re-hab project was in full swing last week when The Leader dropped by for a photo. Town project manager Doug Baird tells us the new water line was going in and should be finished soon (may be by now), meaning the temporary system would not be needed. The inconvenience will last a while longer, but the result will be a brand new street, long overdue.

Share this post

Post Comment